Agawam High School

Building Project

Document Library

NEASC Report – Final 2019

MODULE 1: Eligibility Period

h

Statement of Interest

h

Agawam High School FS Invite

h

MSBA Signed Design Enrollment Certification

h

TR-2021-68 Feasibility Study for AHS

MODULE 3: Feasibility Study

Preliminary Design Program (PDP) Submission – Volume 1

Preliminary Design Program (PDP) Submission – Volume 2

Preferred Schematic Report (PSR) Submission – 00 LeftField Certification

Preferred Schematic Report (PSR) Submission – 3.3.0 Table of Contents

Preferred Schematic Report (PSR) Submission – 3.3.1 Introduction

Preferred Schematic Report (PSR) Submission – 3.3.2 Existing Conditions

Preferred Schematic Report (PSR) Submission – 3.3.3 Final Evaluation of Alternatives

Preferred Schematic Report (PSR) Submission – 3.3.4 Preferred Solution

Preferred Schematic Report (PSR) Submission – 3.3.5 Local Actions

Facilities Assessment Subcommittee (FAS) Presentation – November 15, 2023

MSBA Monthly Reports

March 2026

February 2026

January 2026

December 2025

November 2025

October 2025

September 2025

August 2025

July 2025

June 2025

May 2025

April 2025

March 2025

February 2025

January 2025

December 2024

November 2024

October 2024

September 2024

August 2024

July 2024

June 2024

May 2024

April 2024

March 2024

February 2024

January 2024

December 2023

November 2023

October 2023

September 2023

August 2023

July 2023

June 2023

May 2023

April 2023

March 2023

February 2023

January 2023

December 2022

PROJECT UPDATES

Construction - Module 7

The High School project is now in Module 7 – Construction. The District and it’s team continue to advance the project and the MSBA continues to monitor the project to ensure it remains on track and meets the expectation of both the District and the MSBA as defined in the Project Funding Agreement. The design team has completed the 100% Construction Documents, Fontaine Bros has awarded all subcontractors and construction is moving full speed ahead. The Community Wing is currently on track to be finished in December 2026.

UPCOMING EVENTS

MOST RECENT EVENTS

Community Forum

Rescheduled to March 11, 2026 – Agwam Senior Center

QUESTIONS

CONTACT US
FAQs