Agawam High School

Building Project

Document Library

NEASC Report – Final 2019

MODULE 1: Eligibility Period

h

Statement of Interest

h

Agawam High School FS Invite

h

MSBA Signed Design Enrollment Certification

h

TR-2021-68 Feasibility Study for AHS

MODULE 3: Feasibility Study

Preliminary Design Program (PDP) Submission – Volume 1

Preliminary Design Program (PDP) Submission – Volume 2

Preferred Schematic Report (PSR) Submission – 00 LeftField Certification

Preferred Schematic Report (PSR) Submission – 3.3.0 Table of Contents

Preferred Schematic Report (PSR) Submission – 3.3.1 Introduction

Preferred Schematic Report (PSR) Submission – 3.3.2 Existing Conditions

Preferred Schematic Report (PSR) Submission – 3.3.3 Final Evaluation of Alternatives

Preferred Schematic Report (PSR) Submission – 3.3.4 Preferred Solution

Preferred Schematic Report (PSR) Submission – 3.3.5 Local Actions

Facilities Assessment Subcommittee (FAS) Presentation – November 15, 2023

MSBA Monthly Reports

March 2024

February 2024

January 2024

December 2023

November 2023

October 2023

September 2023

August 2023

July 2023

June 2023

May 2023

April 2023

March 2023

February 2023

January 2023

December 2022

PROJECT UPDATES

Schematic Design - Module 4

The High School project is now in Module 4 – Schematic Design. This phase will dictate the project budget and design that ultimately will be the basis of the Project Funding Agreement with the MSBA. The completed Schematic Design package will be submitted to the MSBA on May 2, 2024 and will be up for Board Approval at the June 26, 2024 MSBA Board of Directors meeting.

Part of the Schematic Design process also includes the procurement of a CM (Construction Manager) at Risk. This process started with public advertising of the project in December 2023, six very qualified CM firms submitted Qualification Statements and all firms were interviewed on February 14 & 15. Based on the ratings the final selection will be made by the CM-at-Risk Subcommittee the following days.

The project team submitted the Preliminary Design Program (PDP) to the MSBA on July 28, 2023, and received comments back from the MSBA which were responded to. The project team then submitted the Preferred Schematic Report (PSR) on October 26, 2023, and received formal comments back from the MSBA which were responded to on December 6, 2023.

Following the PSR submission, the project team and District then met with the FAS (Facilities Assessment Subcommittee) on November 15th, to introduce the project to the FAS group so they could make the recommendation to present at the MSBA Board of Directors meeting on December 13, when the MSBA Board of Directors unanimously voted that the Town of Agawam and the High School project was approved to proceed into schematic design.

UPCOMING EVENTS

Project Information Night #4

May 1, 2024 – Sapelli School Cafeteria

Project Information Night #3

April 25, 2024 – Lunch at Agawam Senior Center

Project Information Night #2

April 24, 2024 – Phelps School Library

Project Information Night #1

April 10, 2024 – Doering School Auditorium

MOST RECENT EVENTS

Community Forum #5

February 26, 2024 – 7pm at the Agawam Public Library

CM-r Subcommittee Meeting #3

February 15, 2024

CM-r Interviews

February 15, 2024

CM-r Interviews

February 14, 2024

QUESTIONS

CONTACT US
FAQs